Slack chat: #site-maple-ave Participants: Tom Becker, Luis Ortega, Sam Cho, Priya Nair, TimeClock Period: 2023-08-02 07:00:00 – 2024-02-06 07:00:00 Source file: Harbor Lane Builders Slack export Aug 1 2023 - Feb 9 2024.zip · SHA-256 6c54057d77611562d9a49ab9bf5c3e5643de755274a84894d50463937d6cb602 Read from a Slack workspace export. Thread replies are shown in time order and point to the message they answer; mentions are written as names. The uploaded export holds 3 other conversations. This document covers the conversation shown above, the longest in the file. To get another one, upload the export again and type a name under "Which conversation". Voice messages transcribed by AI. Check important passages against the original audio. #1 [2023-08-02 07:00:00] @Priya Nair has joined the channel #2 [2023-08-02 07:01:00] @Luis Ortega has joined the channel #3 [2023-08-02 07:02:00] @Sam Cho has joined the channel #4 [2023-08-02 07:10:00] Tom Becker: Morning all. This channel is the daily log for the Maple Ave duplex. Start and finish times go here, @Luis Ortega please confirm crew hours every day 🙏 #5 [2023-08-02 07:15:00] Luis Ortega: Crew of 4 on site 6:30. Framing second floor today. Reactions: 👍 Tom Becker, Priya Nair #6 [2023-08-02 07:20:00] Sam Cho: (reply to #5) Do we need the nail guns from the yard? #7 [2023-08-02 07:22:00] Luis Ortega: (reply to #5) Yes bring both, and the long level. #8 [2023-08-02 08:05:00] Priya Nair: [not included in export: A-201 framing plan rev C.pdf] Uploaded the revised framing plan, see sheet A-201. #9 [2023-08-02 16:45:00] TimeClock: Clock-out summary for Aug 2: Luis Ortega 10.0 h, Sam Cho 10.0 h, Priya Nair 11.5 h #10 [2023-08-03 11:28:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #11 [2023-08-03 13:24:00] Sam Cho: Finished blocking on the east wall. #12 [2023-08-03 13:57:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. Reactions: 👀 Tom Becker #13 [2023-08-03 15:01:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #14 [2023-08-03 16:57:00] Luis Ortega: Rain this afternoon, we covered the lumber. #15 [2023-08-04 06:47:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #16 [2023-08-04 09:20:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #17 [2023-08-04 11:31:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #18 [2023-08-04 11:49:00] Priya Nair: Ordered, delivery 7am. #19 [2023-08-04 15:49:00] Tom Becker: ok #20 [2023-08-05 06:34:00] Luis Ortega: No problem Sam, leave at 3:30. #21 [2023-08-05 08:46:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #22 [2023-08-05 12:50:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #23 [2023-08-05 13:28:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #24 [2023-08-05 17:12:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #25 [2023-08-06 07:31:00] Tom Becker: ok #26 [2023-08-06 08:05:00] Luis Ortega: Rain this afternoon, we covered the lumber. #27 [2023-08-06 10:36:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. Reactions: 👀 Tom Becker #28 [2023-08-06 15:36:00] Sam Cho: Finished blocking on the east wall. #29 [2023-08-06 17:51:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #30 [2023-08-07 12:47:00] Luis Ortega: No problem Sam, leave at 3:30. #31 [2023-08-07 12:49:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #32 [2023-08-07 13:27:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #33 [2023-08-07 14:25:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #34 [2023-08-07 15:53:00] Priya Nair: Ordered, delivery 7am. #35 [2023-08-08 08:41:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #36 [2023-08-08 09:50:00] Luis Ortega: Rain this afternoon, we covered the lumber. #37 [2023-08-08 10:19:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #38 [2023-08-08 12:50:00] Sam Cho: Finished blocking on the east wall. #39 [2023-08-08 16:18:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #40 [2023-08-09 13:59:00] Tom Becker: ok #41 [2023-08-09 14:00:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #42 [2023-08-09 14:32:00] Priya Nair: Ordered, delivery 7am. #43 [2023-08-09 17:45:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #44 [2023-08-10 07:45:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #45 [2023-08-10 09:32:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #46 [2023-08-10 13:57:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #47 [2023-08-10 16:04:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #48 [2023-08-10 16:44:00] Luis Ortega: No problem Sam, leave at 3:30. Reactions: 👀 Tom Becker #49 [2023-08-11 10:26:00] Sam Cho: Finished blocking on the east wall. #50 [2023-08-11 10:54:00] Luis Ortega: Rain this afternoon, we covered the lumber. #51 [2023-08-11 14:50:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #52 [2023-08-11 16:47:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #53 [2023-08-11 17:07:00] Tom Becker: ok #54 [2023-08-12 08:39:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #55 [2023-08-12 09:54:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #56 [2023-08-12 10:47:00] Priya Nair: Ordered, delivery 7am. #57 [2023-08-12 16:47:00] Luis Ortega: No problem Sam, leave at 3:30. #58 [2023-08-12 16:54:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #59 [2023-08-13 06:42:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #60 [2023-08-13 07:27:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #61 [2023-08-13 08:06:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #62 [2023-08-13 11:12:00] Sam Cho: Finished blocking on the east wall. Reactions: 👀 Tom Becker #63 [2023-08-13 15:26:00] Luis Ortega: Rain this afternoon, we covered the lumber. #64 [2023-08-14 07:11:00] Priya Nair: Ordered, delivery 7am. #65 [2023-08-14 08:49:00] Tom Becker: ok #66 [2023-08-14 11:59:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #67 [2023-08-14 15:14:00] Luis Ortega: No problem Sam, leave at 3:30. #68 [2023-08-14 17:18:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #69 [2023-08-15 09:20:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #70 [2023-08-15 10:41:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #71 [2023-08-15 13:26:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #72 [2023-08-15 17:46:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #73 [2023-08-16 10:01:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #74 [2023-08-16 14:29:00] Luis Ortega: Rain this afternoon, we covered the lumber. #75 [2023-08-16 14:53:00] Sam Cho: Finished blocking on the east wall. #76 [2023-08-16 17:46:00] Tom Becker: ok #77 [2023-08-16 18:26:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #78 [2023-08-17 09:52:00] Priya Nair: Ordered, delivery 7am. Reactions: 👀 Tom Becker #79 [2023-08-17 10:25:00] Luis Ortega: No problem Sam, leave at 3:30. #80 [2023-08-17 12:15:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #81 [2023-08-17 13:40:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #82 [2023-08-17 17:20:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #83 [2023-08-18 08:58:00] Sam Cho: Finished blocking on the east wall. #84 [2023-08-18 09:13:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #85 [2023-08-18 10:04:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #86 [2023-08-18 10:41:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #87 [2023-08-18 17:19:00] Luis Ortega: Rain this afternoon, we covered the lumber. #88 [2023-08-19 07:18:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #89 [2023-08-19 11:10:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #90 [2023-08-19 11:41:00] Priya Nair: Ordered, delivery 7am. #91 [2023-08-19 17:03:00] Luis Ortega: No problem Sam, leave at 3:30. #92 [2023-08-19 17:16:00] Tom Becker: ok #93 [2023-08-20 07:36:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #94 [2023-08-20 07:56:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #95 [2023-08-20 08:22:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. Reactions: 👀 Tom Becker #96 [2023-08-20 12:10:00] Sam Cho: Finished blocking on the east wall. #97 [2023-08-20 15:46:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #98 [2023-08-21 09:25:00] Luis Ortega: Rain this afternoon, we covered the lumber. #99 [2023-08-21 12:09:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #100 [2023-08-21 13:35:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #101 [2023-08-21 14:20:00] Tom Becker: ok #102 [2023-08-22 08:29:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #103 [2023-08-22 10:03:00] Luis Ortega: No problem Sam, leave at 3:30. #104 [2023-08-22 11:45:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #105 [2023-08-22 11:48:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #106 [2023-08-22 15:54:00] Priya Nair: Ordered, delivery 7am. #107 [2023-08-23 09:39:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #108 [2023-08-23 10:31:00] Luis Ortega: Rain this afternoon, we covered the lumber. #109 [2023-08-23 10:48:00] Sam Cho: Finished blocking on the east wall. #110 [2023-08-23 12:42:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #111 [2023-08-23 18:08:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #112 [2023-08-24 08:15:00] Tom Becker: ok Reactions: 👀 Tom Becker #113 [2023-08-24 09:40:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #114 [2023-08-24 10:10:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #115 [2023-08-24 11:42:00] Priya Nair: Ordered, delivery 7am. #116 [2023-08-24 14:27:00] Luis Ortega: No problem Sam, leave at 3:30. #117 [2023-08-25 09:41:00] Sam Cho: Finished blocking on the east wall. #118 [2023-08-25 11:53:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #119 [2023-08-25 12:29:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #120 [2023-08-25 17:13:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #121 [2023-08-25 18:12:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #122 [2023-08-26 07:48:00] Luis Ortega: Rain this afternoon, we covered the lumber. #123 [2023-08-26 08:09:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #124 [2023-08-26 09:29:00] Tom Becker: ok #125 [2023-08-26 11:41:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #126 [2023-08-26 16:05:00] Priya Nair: Ordered, delivery 7am. #127 [2023-08-27 09:43:00] Luis Ortega: No problem Sam, leave at 3:30. #128 [2023-08-27 12:59:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #129 [2023-08-27 14:41:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. Reactions: 👀 Tom Becker #130 [2023-08-27 14:51:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #131 [2023-08-28 07:35:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #132 [2023-08-28 14:01:00] Sam Cho: Finished blocking on the east wall. #133 [2023-08-28 16:39:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #134 [2023-08-28 16:51:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #135 [2023-08-28 17:54:00] Luis Ortega: Rain this afternoon, we covered the lumber. #136 [2023-08-29 06:40:00] Luis Ortega: No problem Sam, leave at 3:30. #137 [2023-08-29 09:41:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #138 [2023-08-29 12:45:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #139 [2023-08-29 14:32:00] Tom Becker: ok #140 [2023-08-29 17:04:00] Priya Nair: Ordered, delivery 7am. #141 [2023-08-30 09:20:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #142 [2023-08-30 11:45:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #143 [2023-08-30 12:47:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #144 [2023-08-30 13:43:00] Sam Cho: Finished blocking on the east wall. #145 [2023-08-30 17:49:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #146 [2023-08-31 06:31:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #147 [2023-08-31 08:32:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #148 [2023-08-31 09:19:00] Luis Ortega: Rain this afternoon, we covered the lumber. Reactions: 👀 Tom Becker #149 [2023-08-31 15:43:00] Tom Becker: ok #150 [2023-08-31 16:10:00] Priya Nair: Ordered, delivery 7am. #151 [2023-09-01 11:14:00] Luis Ortega: No problem Sam, leave at 3:30. #152 [2023-09-01 11:54:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #153 [2023-09-01 14:40:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #154 [2023-09-01 15:03:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #155 [2023-09-01 16:17:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #156 [2023-09-02 08:19:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #157 [2023-09-02 08:31:00] Sam Cho: Finished blocking on the east wall. #158 [2023-09-02 08:38:00] Luis Ortega: Rain this afternoon, we covered the lumber. #159 [2023-09-02 18:07:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #160 [2023-09-03 09:18:00] Luis Ortega: No problem Sam, leave at 3:30. #161 [2023-09-03 13:08:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. Reactions: 👀 Tom Becker #162 [2023-09-03 14:06:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #163 [2023-09-03 16:46:00] Tom Becker: ok #164 [2023-09-03 17:10:00] Priya Nair: Ordered, delivery 7am. #165 [2023-09-04 10:10:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #166 [2023-09-04 13:05:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #167 [2023-09-04 13:36:00] Sam Cho: Finished blocking on the east wall. #168 [2023-09-04 13:46:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #169 [2023-09-04 15:18:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #170 [2023-09-05 09:17:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #171 [2023-09-05 10:02:00] Luis Ortega: Rain this afternoon, we covered the lumber. #172 [2023-09-05 10:56:00] Tom Becker: ok #173 [2023-09-05 15:57:00] Priya Nair: Ordered, delivery 7am. #174 [2023-09-05 17:58:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #175 [2023-09-06 06:58:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #176 [2023-09-06 07:45:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #177 [2023-09-06 08:03:00] Luis Ortega: No problem Sam, leave at 3:30. #178 [2023-09-06 08:39:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #179 [2023-09-06 16:17:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #180 [2023-09-07 10:44:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. Reactions: 👀 Tom Becker #181 [2023-09-07 13:13:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #182 [2023-09-07 17:20:00] Luis Ortega: Rain this afternoon, we covered the lumber. #183 [2023-09-07 18:01:00] Sam Cho: Finished blocking on the east wall. #184 [2023-09-07 18:05:00] Tom Becker: ok #185 [2023-09-08 06:50:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #186 [2023-09-08 10:27:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #187 [2023-09-08 12:17:00] Luis Ortega: No problem Sam, leave at 3:30. #188 [2023-09-08 14:57:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #189 [2023-09-08 15:15:00] Priya Nair: Ordered, delivery 7am. #190 [2023-09-09 06:36:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #191 [2023-09-09 10:57:00] Sam Cho: Finished blocking on the east wall. #192 [2023-09-09 12:18:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #193 [2023-09-09 18:21:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #194 [2023-09-10 12:13:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. Reactions: 👀 Tom Becker #195 [2023-09-10 13:38:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #196 [2023-09-10 15:47:00] Luis Ortega: Rain this afternoon, we covered the lumber. #197 [2023-09-10 16:38:00] Tom Becker: ok #198 [2023-09-10 17:44:00] Priya Nair: Ordered, delivery 7am. #199 [2023-09-11 10:37:00] Luis Ortega: No problem Sam, leave at 3:30. #200 [2023-09-11 11:32:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #201 [2023-09-11 11:57:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #202 [2023-09-11 18:04:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #203 [2023-09-11 18:26:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #204 [2023-09-12 07:30:00] Sam Cho: Finished blocking on the east wall. #205 [2023-09-12 07:51:00] Tom Becker: ok #206 [2023-09-12 08:47:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #207 [2023-09-12 10:34:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #208 [2023-09-12 11:02:00] Luis Ortega: Rain this afternoon, we covered the lumber. #209 [2023-09-13 06:32:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #210 [2023-09-13 10:49:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #211 [2023-09-13 12:13:00] Luis Ortega: No problem Sam, leave at 3:30. #212 [2023-09-13 15:44:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #213 [2023-09-13 17:29:00] Priya Nair: Ordered, delivery 7am. #214 [2023-09-14 07:19:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #215 [2023-09-14 08:31:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #216 [2023-09-14 12:48:00] Luis Ortega: Rain this afternoon, we covered the lumber. #217 [2023-09-14 17:59:00] Sam Cho: Finished blocking on the east wall. #218 [2023-09-14 18:23:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. Reactions: 👀 Tom Becker #219 [2023-09-15 10:39:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #220 [2023-09-15 10:45:00] Priya Nair: Ordered, delivery 7am. #221 [2023-09-15 12:28:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #222 [2023-09-15 17:56:00] Tom Becker: ok #223 [2023-09-16 07:17:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #224 [2023-09-16 08:45:00] Luis Ortega: No problem Sam, leave at 3:30. #225 [2023-09-16 09:19:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #226 [2023-09-16 12:29:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #227 [2023-09-16 15:12:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #228 [2023-09-17 08:54:00] Tom Becker: ok #229 [2023-09-17 09:47:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. Reactions: 👀 Tom Becker #230 [2023-09-17 10:23:00] Sam Cho: Finished blocking on the east wall. #231 [2023-09-17 12:49:00] Luis Ortega: Rain this afternoon, we covered the lumber. #232 [2023-09-17 15:39:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #233 [2023-09-18 06:54:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #234 [2023-09-18 07:17:00] Priya Nair: Ordered, delivery 7am. #235 [2023-09-18 09:07:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #236 [2023-09-18 16:26:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #237 [2023-09-18 16:38:00] Luis Ortega: No problem Sam, leave at 3:30. #238 [2023-09-19 07:04:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #239 [2023-09-19 07:48:00] Sam Cho: Finished blocking on the east wall. #240 [2023-09-19 08:58:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #241 [2023-09-19 17:13:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #242 [2023-09-19 17:27:00] Luis Ortega: Rain this afternoon, we covered the lumber. #243 [2023-09-20 07:50:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #244 [2023-09-20 08:25:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #245 [2023-09-20 12:02:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #246 [2023-09-20 13:33:00] Tom Becker: ok #247 [2023-09-20 17:28:00] Priya Nair: Ordered, delivery 7am. #248 [2023-09-21 09:14:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #249 [2023-09-21 12:43:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #250 [2023-09-21 13:37:00] Luis Ortega: No problem Sam, leave at 3:30. Reactions: 👀 Tom Becker #251 [2023-09-21 18:09:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #252 [2023-09-22 07:13:00] Sam Cho: Finished blocking on the east wall. #253 [2023-09-22 08:56:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #254 [2023-09-22 10:02:00] Luis Ortega: Rain this afternoon, we covered the lumber. #255 [2023-09-22 10:26:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #256 [2023-09-22 17:43:00] Tom Becker: ok #257 [2023-09-23 13:08:00] Luis Ortega: No problem Sam, leave at 3:30. #258 [2023-09-23 16:56:00] Priya Nair: Ordered, delivery 7am. #259 [2023-09-23 18:02:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #260 [2023-09-23 18:09:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #261 [2023-09-23 18:10:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #262 [2023-09-24 07:41:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #263 [2023-09-24 08:40:00] Sam Cho: Finished blocking on the east wall. Reactions: 👀 Tom Becker #264 [2023-09-24 10:29:00] Luis Ortega: Rain this afternoon, we covered the lumber. #265 [2023-09-24 13:39:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #266 [2023-09-24 17:49:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #267 [2023-09-25 06:49:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #268 [2023-09-25 10:19:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #269 [2023-09-25 14:37:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #270 [2023-09-25 15:09:00] Priya Nair: Ordered, delivery 7am. #271 [2023-09-25 16:50:00] Tom Becker: ok #272 [2023-09-26 09:10:00] Luis Ortega: No problem Sam, leave at 3:30. #273 [2023-09-26 11:48:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #274 [2023-09-26 15:54:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #275 [2023-09-26 16:27:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #276 [2023-09-26 16:57:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #277 [2023-09-27 09:36:00] Tom Becker: ok #278 [2023-09-27 10:38:00] Luis Ortega: Rain this afternoon, we covered the lumber. #279 [2023-09-27 13:14:00] Sam Cho: Finished blocking on the east wall. #280 [2023-09-27 14:33:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #281 [2023-09-28 08:30:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #282 [2023-09-28 09:54:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #283 [2023-09-28 12:00:00] Luis Ortega: No problem Sam, leave at 3:30. #284 [2023-09-28 16:21:00] Priya Nair: Ordered, delivery 7am. Reactions: 👀 Tom Becker #285 [2023-09-28 18:15:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #286 [2023-09-29 09:42:00] Luis Ortega: Rain this afternoon, we covered the lumber. #287 [2023-09-29 09:59:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #288 [2023-09-29 10:46:00] Sam Cho: Finished blocking on the east wall. #289 [2023-09-29 15:00:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #290 [2023-09-29 16:11:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #291 [2023-09-30 06:39:00] Priya Nair: Ordered, delivery 7am. #292 [2023-09-30 09:16:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #293 [2023-09-30 10:52:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #294 [2023-09-30 11:08:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #295 [2023-09-30 11:12:00] Tom Becker: ok #296 [2023-10-01 06:39:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. Reactions: 👀 Tom Becker #297 [2023-10-01 10:26:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #298 [2023-10-01 11:29:00] Luis Ortega: No problem Sam, leave at 3:30. #299 [2023-10-01 12:07:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #300 [2023-10-01 12:17:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #301 [2023-10-02 06:44:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #302 [2023-10-02 07:20:00] Luis Ortega: Rain this afternoon, we covered the lumber. #303 [2023-10-02 10:37:00] Sam Cho: Finished blocking on the east wall. #304 [2023-10-02 10:57:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #305 [2023-10-02 13:23:00] Tom Becker: ok #306 [2023-10-03 11:08:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #307 [2023-10-03 12:13:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #308 [2023-10-03 12:26:00] Priya Nair: Ordered, delivery 7am. #309 [2023-10-03 18:13:00] Luis Ortega: No problem Sam, leave at 3:30. #310 [2023-10-04 07:32:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #311 [2023-10-04 08:56:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #312 [2023-10-04 10:48:00] Luis Ortega: Rain this afternoon, we covered the lumber. #313 [2023-10-04 12:33:00] Sam Cho: Finished blocking on the east wall. #314 [2023-10-04 13:03:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #315 [2023-10-05 08:05:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #316 [2023-10-05 09:22:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #317 [2023-10-05 10:15:00] Tom Becker: ok Reactions: 👀 Tom Becker #318 [2023-10-05 13:47:00] Priya Nair: Ordered, delivery 7am. #319 [2023-10-05 17:33:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #320 [2023-10-06 07:24:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #321 [2023-10-06 08:58:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #322 [2023-10-06 13:46:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #323 [2023-10-06 17:11:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #324 [2023-10-06 18:17:00] Luis Ortega: No problem Sam, leave at 3:30. #325 [2023-10-07 09:25:00] Sam Cho: Finished blocking on the east wall. #326 [2023-10-07 10:09:00] Luis Ortega: Rain this afternoon, we covered the lumber. #327 [2023-10-07 10:26:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #328 [2023-10-07 11:48:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #329 [2023-10-07 12:52:00] Tom Becker: ok #330 [2023-10-08 06:54:00] Luis Ortega: No problem Sam, leave at 3:30. #331 [2023-10-08 10:55:00] Priya Nair: Ordered, delivery 7am. #332 [2023-10-08 11:11:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #333 [2023-10-08 15:48:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #334 [2023-10-08 17:44:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. Reactions: 👀 Tom Becker #335 [2023-10-09 06:45:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #336 [2023-10-09 07:05:00] Luis Ortega: Rain this afternoon, we covered the lumber. #337 [2023-10-09 07:36:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #338 [2023-10-09 09:48:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #339 [2023-10-09 15:45:00] Sam Cho: Finished blocking on the east wall. #340 [2023-10-10 07:31:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #341 [2023-10-10 12:09:00] Priya Nair: Ordered, delivery 7am. #342 [2023-10-10 14:47:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #343 [2023-10-10 15:43:00] Tom Becker: ok #344 [2023-10-11 09:15:00] Luis Ortega: No problem Sam, leave at 3:30. #345 [2023-10-11 09:58:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #346 [2023-10-11 12:09:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #347 [2023-10-11 16:03:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #348 [2023-10-11 17:02:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #349 [2023-10-12 08:28:00] Tom Becker: ok #350 [2023-10-12 10:51:00] Sam Cho: Finished blocking on the east wall. #351 [2023-10-12 13:59:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #352 [2023-10-12 14:30:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #353 [2023-10-12 15:03:00] Luis Ortega: Rain this afternoon, we covered the lumber. Reactions: 👀 Tom Becker #354 [2023-10-13 08:03:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #355 [2023-10-13 09:52:00] Priya Nair: Ordered, delivery 7am. #356 [2023-10-13 11:24:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #357 [2023-10-13 12:50:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #358 [2023-10-13 13:29:00] Luis Ortega: No problem Sam, leave at 3:30. #359 [2023-10-14 10:07:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #360 [2023-10-14 11:28:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #361 [2023-10-14 11:45:00] Sam Cho: Finished blocking on the east wall. #362 [2023-10-14 12:29:00] Luis Ortega: Rain this afternoon, we covered the lumber. #363 [2023-10-14 14:48:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #364 [2023-10-15 12:16:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. Reactions: 👀 Tom Becker #365 [2023-10-15 12:48:00] Tom Becker: ok #366 [2023-10-15 14:49:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #367 [2023-10-15 15:22:00] Luis Ortega: No problem Sam, leave at 3:30. #368 [2023-10-15 16:21:00] Priya Nair: Ordered, delivery 7am. #369 [2023-10-16 11:30:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #370 [2023-10-16 12:47:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #371 [2023-10-16 14:48:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #372 [2023-10-16 18:27:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #373 [2023-10-17 06:45:00] Luis Ortega: Rain this afternoon, we covered the lumber. #374 [2023-10-17 07:18:00] Sam Cho: Finished blocking on the east wall. #375 [2023-10-17 10:10:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #376 [2023-10-17 16:08:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #377 [2023-10-17 18:06:00] Tom Becker: ok #378 [2023-10-18 07:10:00] Priya Nair: Ordered, delivery 7am. #379 [2023-10-18 07:24:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #380 [2023-10-18 09:46:00] Luis Ortega: No problem Sam, leave at 3:30. #381 [2023-10-18 15:41:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #382 [2023-10-18 17:41:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #383 [2023-10-19 14:25:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #384 [2023-10-19 15:22:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #385 [2023-10-19 15:40:00] Sam Cho: Finished blocking on the east wall. #386 [2023-10-19 16:54:00] Luis Ortega: Rain this afternoon, we covered the lumber. #387 [2023-10-19 17:53:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. Reactions: 👀 Tom Becker #388 [2023-10-20 08:40:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #389 [2023-10-20 10:08:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #390 [2023-10-20 13:48:00] Luis Ortega: No problem Sam, leave at 3:30. #391 [2023-10-20 13:52:00] Priya Nair: Ordered, delivery 7am. #392 [2023-10-20 17:22:00] Tom Becker: ok #393 [2023-10-21 08:40:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #394 [2023-10-21 08:49:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #395 [2023-10-21 10:51:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #396 [2023-10-21 16:19:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #397 [2023-10-21 17:48:00] Sam Cho: Finished blocking on the east wall. #398 [2023-10-22 07:09:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #399 [2023-10-22 07:35:00] Tom Becker: ok #400 [2023-10-22 14:25:00] Luis Ortega: Rain this afternoon, we covered the lumber. #401 [2023-10-22 18:29:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. Reactions: 👀 Tom Becker #402 [2023-10-23 10:59:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #403 [2023-10-23 13:26:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #404 [2023-10-23 14:04:00] Luis Ortega: No problem Sam, leave at 3:30. #405 [2023-10-23 15:22:00] Priya Nair: Ordered, delivery 7am. #406 [2023-10-23 17:27:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #407 [2023-10-24 06:44:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #408 [2023-10-24 14:34:00] Luis Ortega: Rain this afternoon, we covered the lumber. #409 [2023-10-24 17:06:00] Sam Cho: Finished blocking on the east wall. #410 [2023-10-24 17:28:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #411 [2023-10-24 17:50:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #412 [2023-10-25 07:19:00] Luis Ortega: No problem Sam, leave at 3:30. #413 [2023-10-25 08:49:00] Tom Becker: ok #414 [2023-10-25 10:44:00] Priya Nair: Ordered, delivery 7am. #415 [2023-10-25 13:34:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #416 [2023-10-25 16:46:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #417 [2023-10-26 09:13:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #418 [2023-10-26 11:04:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #419 [2023-10-26 11:33:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. Reactions: 👀 Tom Becker #420 [2023-10-26 14:56:00] Sam Cho: Finished blocking on the east wall. #421 [2023-10-26 18:07:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #422 [2023-10-27 08:35:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #423 [2023-10-27 11:13:00] Luis Ortega: Rain this afternoon, we covered the lumber. #424 [2023-10-27 11:46:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #425 [2023-10-27 13:45:00] Priya Nair: Ordered, delivery 7am. #426 [2023-10-27 14:31:00] Tom Becker: ok #427 [2023-10-28 06:31:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #428 [2023-10-28 07:18:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #429 [2023-10-28 10:47:00] Luis Ortega: No problem Sam, leave at 3:30. #430 [2023-10-28 17:14:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #431 [2023-10-29 11:46:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #432 [2023-10-29 11:57:00] Luis Ortega: Rain this afternoon, we covered the lumber. #433 [2023-10-29 12:55:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #434 [2023-10-29 13:38:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. Reactions: 👀 Tom Becker #435 [2023-10-29 14:57:00] Sam Cho: Finished blocking on the east wall. #436 [2023-10-30 08:18:00] Luis Ortega: No problem Sam, leave at 3:30. #437 [2023-10-30 10:23:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #438 [2023-10-30 15:17:00] Tom Becker: ok #439 [2023-10-30 18:01:00] Priya Nair: Ordered, delivery 7am. #440 [2023-10-30 18:21:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #441 [2023-10-31 06:32:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #442 [2023-10-31 06:47:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #443 [2023-10-31 12:13:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #444 [2023-10-31 16:15:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #445 [2023-10-31 18:09:00] Sam Cho: Finished blocking on the east wall. #446 [2023-11-01 08:39:00] Tom Becker: ok #447 [2023-11-01 12:18:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #448 [2023-11-01 14:50:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #449 [2023-11-01 15:42:00] Priya Nair: Ordered, delivery 7am. #450 [2023-11-01 15:58:00] Luis Ortega: Rain this afternoon, we covered the lumber. #451 [2023-11-02 07:17:00] Luis Ortega: No problem Sam, leave at 3:30. Reactions: 👀 Tom Becker #452 [2023-11-02 12:43:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #453 [2023-11-02 13:22:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #454 [2023-11-02 15:16:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #455 [2023-11-02 16:16:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #456 [2023-11-03 10:36:00] Luis Ortega: Rain this afternoon, we covered the lumber. #457 [2023-11-03 11:36:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #458 [2023-11-03 16:20:00] Sam Cho: Finished blocking on the east wall. #459 [2023-11-03 17:30:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #460 [2023-11-04 07:09:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #461 [2023-11-04 10:13:00] Tom Becker: ok #462 [2023-11-04 11:07:00] Luis Ortega: No problem Sam, leave at 3:30. #463 [2023-11-04 16:00:00] Priya Nair: Ordered, delivery 7am. #464 [2023-11-04 17:30:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #465 [2023-11-05 06:38:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #466 [2023-11-05 13:07:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #467 [2023-11-05 14:36:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #468 [2023-11-05 15:22:00] Sam Cho: Finished blocking on the east wall. Reactions: 👀 Tom Becker #469 [2023-11-05 16:48:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #470 [2023-11-06 07:27:00] Tom Becker: ok #471 [2023-11-06 09:23:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #472 [2023-11-06 09:51:00] Luis Ortega: Rain this afternoon, we covered the lumber. #473 [2023-11-06 11:52:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #474 [2023-11-06 12:22:00] Priya Nair: Ordered, delivery 7am. #475 [2023-11-07 07:01:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #476 [2023-11-07 08:07:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #477 [2023-11-07 08:59:00] Luis Ortega: No problem Sam, leave at 3:30. #478 [2023-11-07 15:50:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #479 [2023-11-07 16:53:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #480 [2023-11-08 07:34:00] Luis Ortega: Rain this afternoon, we covered the lumber. #481 [2023-11-08 07:39:00] Tom Becker: ok #482 [2023-11-08 08:45:00] Sam Cho: Finished blocking on the east wall. #483 [2023-11-08 09:35:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #484 [2023-11-08 15:17:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #485 [2023-11-09 09:32:00] Luis Ortega: No problem Sam, leave at 3:30. #486 [2023-11-09 10:26:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #487 [2023-11-09 10:27:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #488 [2023-11-09 12:16:00] Priya Nair: Ordered, delivery 7am. Reactions: 👀 Tom Becker #489 [2023-11-09 14:16:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #490 [2023-11-10 09:09:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #491 [2023-11-10 12:50:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #492 [2023-11-10 12:55:00] Sam Cho: Finished blocking on the east wall. #493 [2023-11-10 16:34:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #494 [2023-11-11 11:36:00] Tom Becker: ok #495 [2023-11-11 15:34:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #496 [2023-11-11 16:29:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #497 [2023-11-11 17:07:00] Priya Nair: Ordered, delivery 7am. #498 [2023-11-11 17:35:00] Luis Ortega: Rain this afternoon, we covered the lumber. #499 [2023-11-12 07:25:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. Reactions: 👀 Tom Becker #500 [2023-11-12 10:55:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #501 [2023-11-12 11:14:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #502 [2023-11-12 11:51:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #503 [2023-11-12 16:14:00] Luis Ortega: No problem Sam, leave at 3:30. #504 [2023-11-13 07:35:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #505 [2023-11-13 10:06:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #506 [2023-11-13 11:20:00] Luis Ortega: Rain this afternoon, we covered the lumber. #507 [2023-11-13 13:19:00] Sam Cho: Finished blocking on the east wall. #508 [2023-11-13 17:14:00] Tom Becker: ok #509 [2023-11-14 07:15:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #510 [2023-11-14 11:32:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #511 [2023-11-14 12:09:00] Luis Ortega: No problem Sam, leave at 3:30. #512 [2023-11-14 16:11:00] Priya Nair: Ordered, delivery 7am. #513 [2023-11-14 17:56:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #514 [2023-11-15 08:06:00] Sam Cho: Finished blocking on the east wall. #515 [2023-11-15 09:05:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #516 [2023-11-15 11:54:00] Luis Ortega: Rain this afternoon, we covered the lumber. #517 [2023-11-15 14:03:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #518 [2023-11-15 14:36:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #519 [2023-11-16 07:15:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #520 [2023-11-16 07:16:00] Priya Nair: Ordered, delivery 7am. #521 [2023-11-16 13:08:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #522 [2023-11-16 15:56:00] Tom Becker: ok Reactions: 👀 Tom Becker #523 [2023-11-17 07:05:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #524 [2023-11-17 12:23:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #525 [2023-11-17 13:18:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #526 [2023-11-17 15:26:00] Luis Ortega: No problem Sam, leave at 3:30. #527 [2023-11-17 16:55:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #528 [2023-11-18 07:28:00] Luis Ortega: Rain this afternoon, we covered the lumber. #529 [2023-11-18 09:20:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #530 [2023-11-18 11:30:00] Tom Becker: ok #531 [2023-11-18 12:37:00] Sam Cho: Finished blocking on the east wall. #532 [2023-11-18 13:46:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #533 [2023-11-19 07:09:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #534 [2023-11-19 07:19:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #535 [2023-11-19 09:41:00] Priya Nair: Ordered, delivery 7am. #536 [2023-11-19 12:29:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. Reactions: 👀 Tom Becker #537 [2023-11-19 15:04:00] Luis Ortega: No problem Sam, leave at 3:30. #538 [2023-11-20 07:30:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #539 [2023-11-20 10:00:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #540 [2023-11-20 10:08:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #541 [2023-11-20 10:49:00] Sam Cho: Finished blocking on the east wall. #542 [2023-11-20 17:39:00] Luis Ortega: Rain this afternoon, we covered the lumber. #543 [2023-11-21 06:41:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #544 [2023-11-21 11:06:00] Priya Nair: Ordered, delivery 7am. #545 [2023-11-21 14:32:00] Tom Becker: ok #546 [2023-11-21 16:28:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #547 [2023-11-21 17:57:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #548 [2023-11-22 07:54:00] Luis Ortega: No problem Sam, leave at 3:30. #549 [2023-11-22 09:29:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #550 [2023-11-22 10:33:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #551 [2023-11-22 13:02:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #552 [2023-11-23 08:29:00] Sam Cho: Finished blocking on the east wall. #553 [2023-11-23 15:05:00] Tom Becker: ok #554 [2023-11-23 15:25:00] Luis Ortega: Rain this afternoon, we covered the lumber. Reactions: 👀 Tom Becker #555 [2023-11-23 16:17:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #556 [2023-11-23 16:46:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #557 [2023-11-24 08:51:00] Priya Nair: Ordered, delivery 7am. #558 [2023-11-24 11:01:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #559 [2023-11-24 12:31:00] Luis Ortega: No problem Sam, leave at 3:30. #560 [2023-11-24 13:16:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #561 [2023-11-24 15:29:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #562 [2023-11-25 07:45:00] Luis Ortega: Rain this afternoon, we covered the lumber. #563 [2023-11-25 08:30:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #564 [2023-11-25 10:07:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #565 [2023-11-25 13:13:00] Sam Cho: Finished blocking on the east wall. #566 [2023-11-25 16:03:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #567 [2023-11-26 07:34:00] Priya Nair: Ordered, delivery 7am. #568 [2023-11-26 10:34:00] Tom Becker: ok #569 [2023-11-26 14:13:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. Reactions: 👀 Tom Becker #570 [2023-11-26 14:27:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #571 [2023-11-26 15:30:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #572 [2023-11-27 06:44:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #573 [2023-11-27 07:38:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #574 [2023-11-27 08:41:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #575 [2023-11-27 14:31:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #576 [2023-11-27 16:47:00] Luis Ortega: No problem Sam, leave at 3:30. #577 [2023-11-28 06:34:00] Tom Becker: ok #578 [2023-11-28 13:44:00] Luis Ortega: Rain this afternoon, we covered the lumber. #579 [2023-11-28 13:51:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #580 [2023-11-28 15:44:00] Sam Cho: Finished blocking on the east wall. #581 [2023-11-29 08:01:00] Luis Ortega: No problem Sam, leave at 3:30. #582 [2023-11-29 12:55:00] Priya Nair: Ordered, delivery 7am. #583 [2023-11-29 14:27:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #584 [2023-11-29 16:15:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #585 [2023-11-29 17:26:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #586 [2023-11-30 07:06:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. Reactions: 👀 Tom Becker #587 [2023-11-30 13:54:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #588 [2023-11-30 15:49:00] Luis Ortega: Rain this afternoon, we covered the lumber. #589 [2023-11-30 16:01:00] Sam Cho: Finished blocking on the east wall. #590 [2023-11-30 18:22:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #591 [2023-12-01 09:09:00] Tom Becker: ok #592 [2023-12-01 10:40:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #593 [2023-12-01 12:51:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #594 [2023-12-01 14:07:00] Priya Nair: Ordered, delivery 7am. #595 [2023-12-01 17:46:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #596 [2023-12-02 07:36:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #597 [2023-12-02 10:39:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #598 [2023-12-02 12:49:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #599 [2023-12-02 16:55:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #600 [2023-12-02 17:05:00] Luis Ortega: No problem Sam, leave at 3:30. #601 [2023-12-03 10:32:00] Sam Cho: Finished blocking on the east wall. #602 [2023-12-03 10:40:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. Reactions: 👀 Tom Becker #603 [2023-12-03 12:28:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #604 [2023-12-03 14:33:00] Tom Becker: ok #605 [2023-12-03 14:42:00] Luis Ortega: Rain this afternoon, we covered the lumber. #606 [2023-12-04 06:41:00] Priya Nair: Ordered, delivery 7am. #607 [2023-12-04 11:16:00] Luis Ortega: No problem Sam, leave at 3:30. #608 [2023-12-04 16:56:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #609 [2023-12-04 17:59:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #610 [2023-12-05 13:02:00] Luis Ortega: Rain this afternoon, we covered the lumber. #611 [2023-12-05 14:29:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #612 [2023-12-05 16:33:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #613 [2023-12-05 16:49:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #614 [2023-12-05 18:11:00] Sam Cho: Finished blocking on the east wall. #615 [2023-12-06 09:48:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #616 [2023-12-06 11:09:00] Priya Nair: Ordered, delivery 7am. #617 [2023-12-06 11:47:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #618 [2023-12-06 12:57:00] Tom Becker: ok #619 [2023-12-06 17:34:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #620 [2023-12-07 12:15:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #621 [2023-12-07 13:36:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #622 [2023-12-07 14:11:00] Luis Ortega: No problem Sam, leave at 3:30. #623 [2023-12-07 15:50:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #624 [2023-12-07 18:08:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. Reactions: 👀 Tom Becker #625 [2023-12-08 09:25:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #626 [2023-12-08 11:48:00] Sam Cho: Finished blocking on the east wall. #627 [2023-12-08 13:33:00] Luis Ortega: Rain this afternoon, we covered the lumber. #628 [2023-12-08 15:52:00] Tom Becker: ok #629 [2023-12-08 17:42:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #630 [2023-12-09 10:45:00] Luis Ortega: No problem Sam, leave at 3:30. #631 [2023-12-09 12:01:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #632 [2023-12-09 12:16:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #633 [2023-12-09 12:55:00] Priya Nair: Ordered, delivery 7am. #634 [2023-12-09 13:19:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #635 [2023-12-10 07:59:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. Reactions: 👀 Tom Becker #636 [2023-12-10 13:42:00] Sam Cho: Finished blocking on the east wall. #637 [2023-12-10 16:13:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #638 [2023-12-10 16:28:00] Luis Ortega: Rain this afternoon, we covered the lumber. #639 [2023-12-10 17:38:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #640 [2023-12-11 08:58:00] Priya Nair: Ordered, delivery 7am. #641 [2023-12-11 10:37:00] Tom Becker: ok #642 [2023-12-11 11:38:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #643 [2023-12-11 18:16:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #644 [2023-12-12 07:09:00] Luis Ortega: No problem Sam, leave at 3:30. #645 [2023-12-12 08:53:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #646 [2023-12-12 09:00:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #647 [2023-12-12 09:03:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #648 [2023-12-12 12:44:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #649 [2023-12-13 07:52:00] Sam Cho: Finished blocking on the east wall. #650 [2023-12-13 10:11:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #651 [2023-12-13 11:56:00] Tom Becker: ok #652 [2023-12-13 15:21:00] Luis Ortega: Rain this afternoon, we covered the lumber. #653 [2023-12-13 15:38:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #654 [2023-12-14 10:21:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #655 [2023-12-14 13:06:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #656 [2023-12-14 15:08:00] Luis Ortega: No problem Sam, leave at 3:30. Reactions: 👀 Tom Becker #657 [2023-12-14 17:11:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #658 [2023-12-14 17:17:00] Priya Nair: Ordered, delivery 7am. #659 [2023-12-15 08:27:00] Sam Cho: Finished blocking on the east wall. #660 [2023-12-15 08:31:00] Luis Ortega: Rain this afternoon, we covered the lumber. #661 [2023-12-15 12:25:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #662 [2023-12-15 13:31:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #663 [2023-12-15 15:55:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #664 [2023-12-16 07:12:00] Priya Nair: Ordered, delivery 7am. #665 [2023-12-16 07:20:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #666 [2023-12-16 07:48:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #667 [2023-12-16 11:27:00] Luis Ortega: No problem Sam, leave at 3:30. #668 [2023-12-16 16:11:00] Tom Becker: ok #669 [2023-12-17 07:10:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #670 [2023-12-17 09:42:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #671 [2023-12-17 14:06:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #672 [2023-12-17 16:45:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #673 [2023-12-18 08:24:00] Sam Cho: Finished blocking on the east wall. Reactions: 👀 Tom Becker #674 [2023-12-18 09:33:00] Tom Becker: ok #675 [2023-12-18 10:32:00] Luis Ortega: Rain this afternoon, we covered the lumber. #676 [2023-12-18 14:22:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #677 [2023-12-18 15:47:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #678 [2023-12-19 09:14:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #679 [2023-12-19 12:27:00] Priya Nair: Ordered, delivery 7am. #680 [2023-12-19 13:12:00] Luis Ortega: No problem Sam, leave at 3:30. #681 [2023-12-19 13:19:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #682 [2023-12-19 14:24:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #683 [2023-12-20 09:18:00] Luis Ortega: Rain this afternoon, we covered the lumber. #684 [2023-12-20 11:49:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #685 [2023-12-20 13:02:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #686 [2023-12-20 14:21:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #687 [2023-12-20 15:49:00] Sam Cho: Finished blocking on the east wall. #688 [2023-12-21 07:35:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #689 [2023-12-21 10:14:00] Tom Becker: ok #690 [2023-12-21 10:23:00] Priya Nair: Ordered, delivery 7am. Reactions: 👀 Tom Becker #691 [2023-12-21 11:56:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #692 [2023-12-21 15:11:00] Luis Ortega: No problem Sam, leave at 3:30. #693 [2023-12-22 07:52:00] Sam Cho: Finished blocking on the east wall. #694 [2023-12-22 10:21:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #695 [2023-12-22 14:04:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #696 [2023-12-22 15:37:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #697 [2023-12-22 15:50:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #698 [2023-12-23 06:57:00] Luis Ortega: Rain this afternoon, we covered the lumber. #699 [2023-12-23 10:49:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #700 [2023-12-23 14:48:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #701 [2023-12-23 17:48:00] Tom Becker: ok #702 [2023-12-24 07:05:00] Luis Ortega: No problem Sam, leave at 3:30. #703 [2023-12-24 08:57:00] Priya Nair: Ordered, delivery 7am. #704 [2023-12-24 14:26:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #705 [2023-12-24 15:53:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #706 [2023-12-24 18:03:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #707 [2023-12-25 08:55:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #708 [2023-12-25 09:12:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #709 [2023-12-25 10:56:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. Reactions: 👀 Tom Becker #710 [2023-12-25 13:25:00] Sam Cho: Finished blocking on the east wall. #711 [2023-12-25 13:55:00] Luis Ortega: Rain this afternoon, we covered the lumber. #712 [2023-12-26 07:34:00] Tom Becker: ok #713 [2023-12-26 13:07:00] Luis Ortega: No problem Sam, leave at 3:30. #714 [2023-12-26 15:23:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #715 [2023-12-26 15:48:00] Priya Nair: Ordered, delivery 7am. #716 [2023-12-26 16:49:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #717 [2023-12-27 09:01:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #718 [2023-12-27 10:26:00] Sam Cho: Finished blocking on the east wall. #719 [2023-12-27 13:06:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #720 [2023-12-27 13:23:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #721 [2023-12-27 17:42:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #722 [2023-12-28 08:44:00] Luis Ortega: Rain this afternoon, we covered the lumber. #723 [2023-12-28 13:28:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #724 [2023-12-28 13:30:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #725 [2023-12-28 16:40:00] Tom Becker: ok Reactions: 👀 Tom Becker #726 [2023-12-28 16:49:00] Priya Nair: Ordered, delivery 7am. #727 [2023-12-29 07:45:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #728 [2023-12-29 09:28:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #729 [2023-12-29 12:52:00] Luis Ortega: No problem Sam, leave at 3:30. #730 [2023-12-29 13:57:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #731 [2023-12-30 09:36:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #732 [2023-12-30 11:33:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #733 [2023-12-30 12:16:00] Luis Ortega: Rain this afternoon, we covered the lumber. #734 [2023-12-30 13:04:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #735 [2023-12-30 17:09:00] Sam Cho: Finished blocking on the east wall. #736 [2023-12-31 07:25:00] Tom Becker: ok #737 [2023-12-31 09:03:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #738 [2023-12-31 15:35:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #739 [2023-12-31 15:41:00] Luis Ortega: No problem Sam, leave at 3:30. #740 [2023-12-31 17:44:00] Priya Nair: Ordered, delivery 7am. #741 [2024-01-01 12:34:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #742 [2024-01-01 14:37:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. Reactions: 👀 Tom Becker #743 [2024-01-01 15:03:00] Sam Cho: Finished blocking on the east wall. #744 [2024-01-01 17:42:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #745 [2024-01-01 18:22:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #746 [2024-01-02 06:41:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #747 [2024-01-02 13:11:00] Priya Nair: Ordered, delivery 7am. #748 [2024-01-02 15:06:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #749 [2024-01-02 15:51:00] Tom Becker: ok #750 [2024-01-02 17:33:00] Luis Ortega: Rain this afternoon, we covered the lumber. #751 [2024-01-03 06:42:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #752 [2024-01-03 06:53:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #753 [2024-01-03 10:23:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #754 [2024-01-03 16:47:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #755 [2024-01-03 16:55:00] Luis Ortega: No problem Sam, leave at 3:30. #756 [2024-01-04 06:49:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #757 [2024-01-04 13:12:00] Luis Ortega: Rain this afternoon, we covered the lumber. Reactions: 👀 Tom Becker #758 [2024-01-04 15:49:00] Sam Cho: Finished blocking on the east wall. #759 [2024-01-04 18:19:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #760 [2024-01-05 07:48:00] Luis Ortega: No problem Sam, leave at 3:30. #761 [2024-01-05 09:49:00] Tom Becker: ok #762 [2024-01-05 14:33:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #763 [2024-01-05 14:37:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #764 [2024-01-05 15:49:00] Priya Nair: Ordered, delivery 7am. #765 [2024-01-06 10:19:00] Sam Cho: Finished blocking on the east wall. #766 [2024-01-06 12:46:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #767 [2024-01-06 14:28:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #768 [2024-01-06 15:41:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #769 [2024-01-06 17:47:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #770 [2024-01-07 11:14:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #771 [2024-01-07 13:21:00] Tom Becker: ok #772 [2024-01-07 13:23:00] Luis Ortega: Rain this afternoon, we covered the lumber. #773 [2024-01-07 14:00:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #774 [2024-01-07 17:02:00] Priya Nair: Ordered, delivery 7am. #775 [2024-01-08 09:06:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #776 [2024-01-08 09:35:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #777 [2024-01-08 10:45:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. Reactions: 👀 Tom Becker #778 [2024-01-08 11:13:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #779 [2024-01-08 17:34:00] Luis Ortega: No problem Sam, leave at 3:30. #780 [2024-01-09 07:10:00] Tom Becker: ok #781 [2024-01-09 10:33:00] Luis Ortega: Rain this afternoon, we covered the lumber. #782 [2024-01-09 11:26:00] Sam Cho: Finished blocking on the east wall. #783 [2024-01-09 11:44:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #784 [2024-01-09 16:56:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #785 [2024-01-10 09:39:00] Luis Ortega: No problem Sam, leave at 3:30. #786 [2024-01-10 15:19:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #787 [2024-01-10 17:24:00] Priya Nair: Ordered, delivery 7am. #788 [2024-01-10 17:57:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #789 [2024-01-10 18:00:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #790 [2024-01-11 10:16:00] Sam Cho: Finished blocking on the east wall. #791 [2024-01-11 12:55:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #792 [2024-01-11 13:53:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #793 [2024-01-11 15:22:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. Reactions: 👀 Tom Becker #794 [2024-01-12 06:46:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #795 [2024-01-12 09:03:00] Priya Nair: Ordered, delivery 7am. #796 [2024-01-12 11:31:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #797 [2024-01-12 16:35:00] Tom Becker: ok #798 [2024-01-12 18:21:00] Luis Ortega: Rain this afternoon, we covered the lumber. #799 [2024-01-13 08:40:00] Luis Ortega: No problem Sam, leave at 3:30. #800 [2024-01-13 10:34:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #801 [2024-01-13 14:39:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #802 [2024-01-13 17:08:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #803 [2024-01-13 17:56:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #804 [2024-01-14 10:28:00] Sam Cho: Finished blocking on the east wall. #805 [2024-01-14 13:44:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #806 [2024-01-14 14:01:00] Luis Ortega: Rain this afternoon, we covered the lumber. #807 [2024-01-14 14:33:00] Tom Becker: ok #808 [2024-01-14 17:08:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #809 [2024-01-15 10:43:00] Priya Nair: Ordered, delivery 7am. #810 [2024-01-15 10:45:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. Reactions: 👀 Tom Becker #811 [2024-01-15 11:23:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #812 [2024-01-15 12:10:00] Luis Ortega: No problem Sam, leave at 3:30. #813 [2024-01-15 15:58:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #814 [2024-01-16 10:07:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #815 [2024-01-16 10:48:00] Sam Cho: Finished blocking on the east wall. #816 [2024-01-16 12:33:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #817 [2024-01-16 13:08:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #818 [2024-01-16 15:08:00] Luis Ortega: Rain this afternoon, we covered the lumber. #819 [2024-01-17 08:52:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #820 [2024-01-17 08:58:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #821 [2024-01-17 11:33:00] Tom Becker: ok #822 [2024-01-17 11:48:00] Priya Nair: Ordered, delivery 7am. #823 [2024-01-18 11:15:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. Reactions: 👀 Tom Becker #824 [2024-01-18 12:28:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #825 [2024-01-18 16:29:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #826 [2024-01-18 16:40:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #827 [2024-01-18 16:49:00] Luis Ortega: No problem Sam, leave at 3:30. #828 [2024-01-19 06:42:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #829 [2024-01-19 10:31:00] Sam Cho: Finished blocking on the east wall. #830 [2024-01-19 11:48:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #831 [2024-01-19 13:13:00] Tom Becker: ok #832 [2024-01-19 18:11:00] Luis Ortega: Rain this afternoon, we covered the lumber. #833 [2024-01-20 07:32:00] Priya Nair: Ordered, delivery 7am. #834 [2024-01-20 10:56:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #835 [2024-01-20 11:11:00] Luis Ortega: No problem Sam, leave at 3:30. #836 [2024-01-20 15:41:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #837 [2024-01-20 18:13:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #838 [2024-01-21 08:54:00] Sam Cho: Finished blocking on the east wall. #839 [2024-01-21 13:22:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #840 [2024-01-21 13:58:00] Luis Ortega: Rain this afternoon, we covered the lumber. #841 [2024-01-21 15:58:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #842 [2024-01-21 18:05:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #843 [2024-01-22 07:41:00] Tom Becker: ok #844 [2024-01-22 08:39:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. Reactions: 👀 Tom Becker #845 [2024-01-22 09:45:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #846 [2024-01-22 15:59:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #847 [2024-01-22 16:27:00] Priya Nair: Ordered, delivery 7am. #848 [2024-01-23 10:53:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #849 [2024-01-23 13:36:00] Luis Ortega: No problem Sam, leave at 3:30. #850 [2024-01-23 13:50:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #851 [2024-01-23 17:47:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #852 [2024-01-24 07:17:00] Tom Becker: ok #853 [2024-01-24 08:49:00] Sam Cho: Finished blocking on the east wall. #854 [2024-01-24 10:37:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #855 [2024-01-24 13:27:00] Luis Ortega: Rain this afternoon, we covered the lumber. #856 [2024-01-24 15:42:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #857 [2024-01-25 10:01:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #858 [2024-01-25 12:37:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #859 [2024-01-25 14:53:00] Priya Nair: Ordered, delivery 7am. #860 [2024-01-25 14:56:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #861 [2024-01-25 16:32:00] Luis Ortega: No problem Sam, leave at 3:30. Reactions: 👀 Tom Becker #862 [2024-01-26 08:29:00] Sam Cho: Finished blocking on the east wall. #863 [2024-01-26 08:43:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #864 [2024-01-26 10:26:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #865 [2024-01-26 10:32:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #866 [2024-01-26 12:57:00] Luis Ortega: Rain this afternoon, we covered the lumber. #867 [2024-01-27 09:24:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #868 [2024-01-27 11:37:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #869 [2024-01-27 14:07:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #870 [2024-01-27 14:16:00] Tom Becker: ok #871 [2024-01-27 16:46:00] Priya Nair: Ordered, delivery 7am. #872 [2024-01-28 07:28:00] Luis Ortega: No problem Sam, leave at 3:30. #873 [2024-01-28 11:06:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #874 [2024-01-28 14:05:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #875 [2024-01-28 14:20:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #876 [2024-01-28 16:11:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #877 [2024-01-29 06:45:00] Sam Cho: Finished blocking on the east wall. Reactions: 👀 Tom Becker #878 [2024-01-29 08:03:00] Tom Becker: ok #879 [2024-01-29 16:23:00] Luis Ortega: Rain this afternoon, we covered the lumber. #880 [2024-01-29 17:06:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #881 [2024-01-30 07:09:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #882 [2024-01-30 07:23:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #883 [2024-01-30 09:04:00] Luis Ortega: No problem Sam, leave at 3:30. #884 [2024-01-30 10:43:00] Priya Nair: Ordered, delivery 7am. #885 [2024-01-30 16:54:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #886 [2024-01-31 12:33:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #887 [2024-01-31 13:55:00] Sam Cho: Finished blocking on the east wall. #888 [2024-01-31 14:10:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #889 [2024-01-31 15:42:00] Luis Ortega: Rain this afternoon, we covered the lumber. #890 [2024-01-31 18:24:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #891 [2024-02-01 08:08:00] Tom Becker: ok #892 [2024-02-01 09:55:00] Priya Nair: Ordered, delivery 7am. Reactions: 👀 Tom Becker #893 [2024-02-01 11:47:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #894 [2024-02-01 12:33:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #895 [2024-02-01 18:08:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #896 [2024-02-02 08:38:00] Luis Ortega: No problem Sam, leave at 3:30. #897 [2024-02-02 09:05:00] Luis Ortega: Crew on site 6:30. ✅ concrete delivery confirmed for 9. #898 [2024-02-02 10:28:00] Priya Nair: Inspector coming at 2 for the rough framing. I will walk him through. #899 [2024-02-02 11:42:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #900 [2024-02-02 12:37:00] Tom Becker: Thanks. Keep the end time to 3:30 this week, we are over budget on labor. #901 [2024-02-03 09:56:00] Sam Cho: Finished blocking on the east wall. #902 [2024-02-03 10:50:00] Luis Ortega: Need 40 more 2x6 studs tomorrow. #903 [2024-02-03 12:04:00] Priya Nair: Stayed until 7 to fix the beam pocket, it was 2 inches off. #904 [2024-02-03 15:24:00] Tom Becker: ok #905 [2024-02-03 16:00:00] Luis Ortega: Rain this afternoon, we covered the lumber. #906 [2024-02-04 13:26:00] Priya Nair: Weekend pour went fine, I was here Saturday 6 to 2. #907 [2024-02-04 13:42:00] Luis Ortega: No problem Sam, leave at 3:30. #908 [2024-02-04 15:12:00] Sam Cho: Mañana llego a las 6:45, tengo cita en la clínica a las 4. #909 [2024-02-04 17:39:00] Priya Nair: Ordered, delivery 7am. #910 [2024-02-05 18:30:00] Priya Nair: I have worked 58 hours this week to keep the inspection date. @Tom Becker these hours are not showing on my paycheck. #911 [2024-02-05 18:41:00] Tom Becker: Salaried staff do not get overtime. We talked about this. (edited) #912 [2024-02-05 18:50:00] Priya Nair: (reply to #910) [not included in export: Offer letter Priya Nair.pdf] My offer letter says hourly, $38/h. I can share it. #913 [2024-02-05 18:52:00] Priya Nair: (reply to #910) My offer letter says hourly, $38/h. Posting here too so it is on the record. Reactions: 👀 Luis Ortega, Sam Cho #914 [2024-02-05 19:05:00] Tom Becker: (reply to #910) Take it to @Dana Whitfield, not this channel. #915 [2024-02-05 19:10:00] This message was deleted. #916 [2024-02-06 06:35:00] Luis Ortega: For the record, Priya was on site every Saturday in January. See the January log (https://harborlane.slack.com/archives/C05HLC4S02/p1706400000). #917 [2024-02-06 06:40:00] Sam Cho: [not included in export: IMG_2207.jpg] Photo of the sign-in sheet from Jan 27. #918 [2024-02-06 07:00:00] Tom Becker: @channel reminder: all hours must be approved by me in TimeClock before Friday.